外加劑后摻法在恰甫其海水利樞紐2#橋施工中的應(yīng)用

[摘 要]  本文通過對(duì)外加劑進(jìn)行先摻法與后摻法的對(duì)比試驗(yàn),最終選用后摻法進(jìn)行了工程應(yīng)用,解決了坍落度損失過快的問題,解決了外加劑與水泥不相適應(yīng)性的問題。
[關(guān)鍵詞]  坍落度損失 先摻法  后摻法

[中圖分類號(hào)]  TU5281042    [文獻(xiàn)標(biāo)識(shí)碼]  A    [文章編號(hào)]  1002 - 3550(2004) 04 - 0079 - 02

Latter admixture experiment was used in the qiafuqihai water pivotal project 2nd bridgeconstruction

GAO Jian2xin ,  HE Zhuan2qing ,  WANG Huai2yi ,  SHA Ji2da ,  TU Er2hong ,  YANG Gui2quan

(Xinjiang Research Institute Of Water Resources And Hydroelectrics Science ,830000 ,China)

Abstract :  This text contrasts the admixture experiment of first admixing method and latter admixing method. At last ,the second method was applied and solved the problem that slump loses quickly and the problem that admixture and cement are not suitable for each other.

Key words :  the loss of slump first admixing method   latter admixing method